1 bed, 5th floor, Muroc, Verona House in Beam Park

42 Verona House, Dunton Way, Dagenham, RM9 6GP

£1,595 Per Calendar Month

Deposit: £1,840

Council Tax Band: C

Key Features

  • Fully fitted kitchen including: fridge, freezer, dishwasher, cooker, microwave
  • Fully fitted bathrooms with bath over shower
  • En-suite shower cubicles (where applicable)
  • Durable wood-effect flooring throughout kitchen/diner, living room & hallway
  • Tiled Bathroom floor and walls
  • Comfortable carpeting throughout the bedrooms
  • Spacious patio or balcony (floor dependent), with space for seating and outdoor dining
  • Contemporary interior décor finish with white walls, skirtings and doors
floor plan 1

ZOOM - Click to view a bigger full apartment plan

Our one bedroom apartment, the Muroc, provides what you need without compromising on space.

As soon as you enter the property, you are welcomed by the open plan kitchen, living and dining area.

The L-shape kitchen worktops make great use of the area to ensure maximum living and entertaining space. Enjoy the views and the natural light from the sliding doors leading out to the balcony.

The main bathroom, featuring a shower over bath and the two storage cupboards, in which one includes the washer-dryer, is located at the rear of the apartment. Opposite, you are welcomed by the double bedroom with provides a perfect place for sleep and relaxation, and benefits from a fitted wardrobe with mirrored sliding doors.

Additional Information:

Weekly Rent: £368.07
Monthly Rent: £1,595.00
Holding Deposit: £360.00*
Tenancy Deposit: £1,840.38*
Council Tax Band: C
Minimum Tenancy Term: 12 Months

*The deposit amounts are approximate and will vary depending on the final rent agreed.

Images are demonstrative of this property type. The images are therefore not plot or site specific and spec may vary slightly.

Background Image background Image

How do you apply?

Find out what you need to apply and what the process is like

Reserve your perfect home

Contact our team to get the process started